Search
Conform
Cancel
关于我们

NEWS

Nollvetec Successfully passed the EN 15085-2 annual audit

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2020-06-03 17:31
  • Views:

(Summary description)Due to the impact of the new crown epidemic, on May 29, German SLV audit expert Wolfgang Borst (Wolfgang.Borst) completed the annual audit of Novico EN 15085-2 by video audit. EN 15085-2 is the quality requirement and certification for rail vehicle welding and processing enterprises. Its connotation is summarized into the following three aspects:

Nollvetec Successfully passed the EN 15085-2 annual audit

(Summary description)Due to the impact of the new crown epidemic, on May 29, German SLV audit expert Wolfgang Borst (Wolfgang.Borst) completed the annual audit of Novico EN 15085-2 by video audit. EN 15085-2 is the quality requirement and certification for rail vehicle welding and processing enterprises. Its connotation is summarized into the following three aspects:

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2020-06-03 17:31
  • Views:
Information
Due to the impact of the new crown epidemic, on May 29, German SLV audit expert Wolfgang Borst (Wolfgang.Borst) completed the annual audit of Novico EN 15085-2 by video audit. EN 15085-2 is the quality requirement and certification for rail vehicle welding and processing enterprises. Its connotation is summarized into the following three aspects:
 
1. Welder training and examination system;
 
2. Base material, welding material, equipment control system;
 
3. Welding project control system.
 
Around the above three aspects, the relevant departments have carefully organized and comprehensively deployed, and made various preparations before the audit. With the help of the company's president's office, the smooth passage of the audit was ensured.
 
In the intense and orderly audit, the audit experts learned about the changes in the company's welding management system in the past year, and checked the system operation document records, welder examination records, project process documents, quality control documents, on-site physical pictures, and complete work specimens. Verification and certification of Novico's welding management system by means of compliance, non-destructive testing personnel, and other methods. The review maker fully affirmed the operation of our company's EN 15085 system, and agreed that our company's welding management system is complex, adequate and continuous in operation.
 
The review experts put forward quick recommendations for the next step in the operation of the welding management system: standard management needs to be more systematic. In order to reduce the risk of quality problems caused by the failure to learn the standard version in time, the standard needs to be reviewed regularly or contact relevant agencies to obtain the standard With the updated information, the relevant personnel of Novico clarified the improvement items, combined with the actual situation of the company, and reasonably adopted the improvement suggestions. In order to make the operation of the welding management system more effective, we need to continue to improve and make persistent efforts!

Scan the QR code to read on your phone

Shandong Nollvetec Lightweight Equipment Co., Ltd.

Beiyi Road, Zhuyouguan Town, Longkou City, Shandong Province

Related Links

版权

Time of issue:2019-05-22 00:00:00

© 2020 Shandong Nollvetec Lightweight Equipment Co., Ltd.  ICP: 16029055-1   Powered by: www.300.cn